Advertised: 12 August 2026
Hornibrook NGI Ltd
Construction, Building and Architecture | Morobe
Hornibrook NGI Ltd

Share this job:


JOIN OUR TEAM | CONSTRUCTION PROGRAMMER/SCHEDULER

We are seeking a highly motivated and detail-oriented Construction Programmer/Scheduler to join our team and play a key role in the successful delivery of Hornibrook NGI’s construction, fabrication, and mining support projects.

The successful candidate will support drive productivity, optimize resource utilization, and ensure projects are delivered safely, efficiently, and on schedule.

What You’ll Do

  • Develop and maintain detailed project schedules using Microsoft Project, including work breakdown structures (WBS), activities, logic links, durations, and critical path analysis.
  • Produce baseline schedules, progress updates, look-ahead programmes, and recovery schedules as required.
  • Resource-load schedules and coordinate with site teams, subcontractors, and internal departments (Operations, Fabrication, Logistics) to ensure realistic resource allocation.
  • Track actual progress against planned progress, identify variances, and recommend corrective actions.
  • Prepare and issue regular schedule reports, S-curves, histograms, and dashboards for management and project stakeholders.
  • Participate in project planning meetings, progress reviews, and coordination sessions.
  • Support the preparation of tender schedules and programme submissions for new work.
  • Ensure schedules comply with contract requirements and company standards.
  • Assist with claim preparation and delay analysis when required.
  • Maintain version control and proper documentation of all schedule files.

What We’re Looking For

  • Diploma or Degree in Construction Management, Civil Engineering, Quantity Surveying, or related field.
  • Experience working in Papua New Guinea or similar remote/project environments.
  • Familiarity with Primavera P6 (advantageous but not essential).
  • Previous experience in mining infrastructure, heavy civil, or industrial projects.
  • Proven experience as a Construction Scheduler or Planning Engineer on construction, civil, or mining-related projects.
  • Strong proficiency in Microsoft Project (essential) – ability to build complex schedules, apply constraints, resource load, track progress, and produce professional reports.
  • Solid understanding of construction sequencing, critical path method (CPM), and project controls principles.
  • Ability to interpret drawings, specifications, and method statements.
  • Strong analytical and problem-solving skills with attention to detail.
  • Good written and verbal communication skills.
  • Ability to work effectively under pressure and meet tight deadlines.
  • Competent in Microsoft Office (Excel, Word, PowerPoint).

Desirable Attributes

  • Organised, proactive, and results-oriented.
  • Able to work both independently and as part of a multi-disciplinary team.
  • Professional and confident when dealing with site personnel, subcontractors, and management.

Apply Now

Interested candidates should submit their application letter, updated CV, copies of relevant qualifications, and contact details of at least two professional referees to;

The HR Manager

Hornibrook NGI Ltd

P.O. Box 1812, Lae, Morobe Province

Email: [email protected]

Closing Date: Wednesday, 19th August, 2026. Only shortlisted applicants will be contacted.

Be the link that keeps our projects moving forward. Apply today and help build tomorrow’s infrastructure.

More information

Job ID: #28125

Industry: Construction, Building and Architecture

Location: Morobe, Papua New Guinea

Company: Hornibrook NGI Ltd

Company Description: We have a history of being an integral part of PNG’s industrial and development. Our success can be measured in customer satisfaction, and the cost effectiveness of our products and services. It is due to a number of factors that differentiate us from our competitors, including such things as the provision of daily meals for all our people, free on-site medical services to maintain tradespersons health and wellbeing, and a culture of continuous improvement. We pride ourselves in delivering quality and excellence, no matter how big or small the job.

Company Website: www.hornibrook.com.pg

Source: www.pngworkforce.com


Apply for JOIN OUR TEAM | CONSTRUCTION PROGRAMMER/SCHEDULER

* = Mandatory field
Contact Details

(your current or most recent job title)
Cover Letter
Resume
or cancel

Email job to a friend